Once everything was cured I pre nailed the entire butt rib profile so I wouldn't have to deal with this while spreading the epoxy.
I did not let the nails poke through anywhere on the rib plate.......yet!
Once the nails were all started I very carefully positioned the nose tip / cap strip pre-glued assembly on 1/8" bobbed butt plate making sure it was aligned perfectly. I then set it on the table and tapped on 4 nails on the back side of where the nose block goes. This helps in assembly once the epoxy is on. The nails self alight with the divots.
Click to enlarge
No comments:
Post a Comment